
Let AI Check Your Contractor's Budget Before You Sign
Use AI to cross-check quotes against specs and email history: vanished discounts, the wrong cable class and retail price benchmarks for every material.
Before you sign a contractor's budget, have an AI model read it against the technical specification and your email history with that contractor. It's good at the boring cross-checks people skip: a discount you negotiated that quietly disappeared from the final quote, or a line item that doesn't match the spec. It can also look up retail prices for every material so you know where the markup is.
What kinds of errors does it catch?
A discount that disappears. You agree a discount on flooring by email. Two quote revisions later, it's gone, and nobody mentions it. On a renovation that can easily be tens of thousands of CZK. Give the model the full email thread and every version of the quote, and it will find the row where the agreed price doesn't match, with the sum.
A line item that doesn't match the spec. The technical report requires fire-retardant cable, and the budget prices ordinary cable. This happens even when the same electrician wrote both documents. It's not just about price: a mismatch like this can fail the fire inspection and mean ripping out finished work. Asking the model to compare spec and budget line by line catches it before anything is installed.
Markup you can't see. Ask the model to add a column with the current retail price of each material: ventilation, bricks, tiles, flooring. Then register as a regular customer at a couple of building wholesalers and check the prices yourself. On a full build, the gaps can add up to serious money.
How do you set it up?
- Create one project per build in your AI assistant, so the context stays together.
- Upload everything: drawings, the technical report or specification, every version of every quote, and the email thread with each contractor.
- Ask specific questions, one at a time:
- "List every price or discount agreed in the emails, and check whether each one appears in the latest quote."
- "Compare the specification with the budget line by line. Flag any item where the material or performance class differs."
- "Add a column with the current retail price of each material from local suppliers, with sources."
- "Which items have the largest gap between quote and retail?"
- Verify every finding yourself before you raise it with the contractor. The model points; you confirm.
How do you use the results with the contractor?
Bring facts, not accusations: "Our email of 12 March agreed X, the quote says Y." Most discrepancies are mistakes, not fraud, and a precise reference gets them fixed quickly.
The next step is already in sight: an agent that negotiates by email from those facts directly. In price negotiations the tone matters little and the numbers matter a lot. For now, send those emails yourself.
What are the limits?
- Retail is not trade. A contractor's price includes labour, risk, warranty and logistics. A gap against retail is a question, not proof of overcharging.
- Scanned drawings and handwritten notes are read less reliably than text PDFs. Check anything the model says about a drawing.
- It doesn't replace a site engineer on safety-critical decisions. It catches mismatches between documents. It can't check what was actually installed.
Who is this for?
Anyone signing a budget larger than a few hundred thousand CZK: a business fitting out premises, a company building a warehouse, a family renovating. It's equally useful for any service quote with many line items, such as IT, marketing retainers or maintenance contracts.
Where should you start?
Take the last quote you signed and the email thread that led to it, and ask the model to check that every agreed term made it into the final version. It takes ten minutes, and it's a good test of whether to trust it with the next one.
If you'd like a repeatable quote-checking workflow for your purchasing team, I can set it up with you.